Close

Member Login

[online_awards_system id=20]

WELCOME

Welcome to the online entry portal for the 2018 Master Builders-Bankwest Building Excellence Awards for the Goldfields-Esperance Region.

Here you will be able to complete and submit your awards entry/ies entirely online. Entries must be submitted by COB Friday 1 June 2018.

These awards give you the opportunity to have your quality of workmanship independently and impartially assessed by a panel of registered builders.

See below for further information regarding entry fees, categories & criteria, entry requirements and additional entry forms.


ENTRY FEES

You will be sent an invoice within 14 days of submitting your entry/ies. View the entry fees below:

Entry Type Residential Entries Commercial Entries Subcontractor Entries 
First Entry (per category) $380 $950 $350
Additional Entry (per category) $275 $620 $560
Specialist Entry (per category) $275 $275 $250
Safety Entry $495 $1,650 $400
Safety Travel Fee (for all projects outside of the Perth GPO) $400 $400 N/A
Customer Service $600 N/A N/A
Project Photography  POA POA N/A

CATEGORIES & CRITERIA

To view a list of all categories and criteria available for entry, please see the Entry Kit.

Please note the below categories require HARD COPY ENTRIES and will not be available to enter online. The relevant Entry Form can be found in the Entry Kit:
  • Bankwest Best Customer Service Entry Form
  • Subcontractor Entry Form
  • Safety Award Entry Form

ENTRY REQUIREMENTS

For your online entry, you will need to upload the following entry requirements (you will be able to save your entry to complete at a later date. However, they cannot be edited once submitted).

Please be aware that empahasis will be placed on the on-site inspection by a team of judges. It is therefore important that the builder and/or client are on-site for the inspection to answer any questions posed by the judges.

Please note; all files to accompany your entry must be under 2MB. Should you be unable to re-size a file to 2MB, please submit a labelled USB to your local Master Builders office containing any additional files, labelled with the project address.

Requirements for ALL Entries: 

  1. All entry details including builder and project details, client approval and entry fee (completed via the portal)
  2. A sixty (60) word synopsis of the home/project to be used in all editorials (Word Document only)
  3. A brief company history (PDF)
  4. Current map/street directory page with the street highlighted (PDF)
  5. A simplified A4 floor plan (PDF)
  6. Any supporting documentation ie additional plans, references, safety statistics etc (PDF)
  7. High resolution photographs of the home/project (see below for further details)

Photographs with Entries

Photographs must be submitted with all entries. Images provided will be used in the audio-visual presentation and media; good quality material will better profile your entry. Photographs should highlight the areas of interest in your project and/or support your nomination/s for additional trade/specialist Awards.

At a minimum, please provide:

  1. Four (4) high resolution colour images showing differing INTERNAL aspects of the completed project
  2. Four (4) high resolution colour images showing differing EXTERNAL aspects of the completed project

ADDITIONAL ENTRY REQUIREMENTS

Additional entry requirements – Alterations & Additions Entries:

  • Include two (2) INTERNAL and two (2) EXTERNAL high resolution ‘before’ photographs where possible
  • A simplified A4 floor plan. Alterations & Additions to also include ‘before’ plans (PDF)

Additional entry requirements – Trade/Specialist Entries:

  • One (1) page document that addresses the relevant criteria and assists the judges in assessing the relative merits of each project for Trade/Specialist Awards (PDF)

Additional entry requirements – Display Home Entries:

  • Letter of Authority from local authority or developer (PDF)
  • Sales Brochure (PDF)

Additional entry requirements – Customer Service Entries:

  • An Excel spreadsheet of ALL clients who have had homes completed within the last twelve (12) months to be used in a telephone survey to assist in the judging process
  • 4-8 high resolution jpeg images of your staff or office environment that illustrate your approach to customer
    service
  • A copy of your company logo in eps and jpg formats

Additional entry requirements – Construction Entries:

  • Client declaration form outlining and confirming the requirements of the project (see the end of this kit for Client Declaration Form)
  • A detailed description of the project that addresses the judging criteria and assists the judges in assessing relative merits of each project. Please be concise and include relevant details and technical information about the project, keeping in mind that Master Builders focus on quality of workmanship (PDF)

Additional entry requirements – Subcontractor Entries:

  • A reference from the builder

Additional entry requirements – Apprentice Entries:

  •  Photos or physical examples of work conducted by the Apprentice
  • A letter to the Judges from the Apprentice detailing the most interesting work completed under their Apprenticeship, or what they are most proud of. In particular, noting unusual projects worked on or work undertaken displaying a high level of skill (PDF)

 CONTACT US

All entries must be submitted by COB Friday 1 June 2018. 

Should you need any assistance, please contact the Events Team on events@mbawa.com or (08) 9476 9800.