Close

Member Login

  1. | 6 Jun 2013

    Safety Management Plan (Residential)

    WorkSafe WA has introduced mandatory site-specific safety management plans for domestic construction as from 1 October 2008. Where five or more persons are working or are likely to be working simultaneously on a domestic construction site, you will need to have a site-specific occupational health and safety management plan prepared before work commences. The plan […]

  1. | 6 Jun 2013

    Site Works and Contracts

    Site costs can be a difficult element of a building contract. In most situations, builders will not specify an exact amount for site works, but will nominate a “provisional sum” or best estimate which may be adjusted up or down depending on work actually required. Under the Home Building Contracts Act a builder cannot just […]

  1. | 6 Jun 2013

    Survey Plans

    A legal survey exists for all land (lots) in Western Australia. Survey plans are the official record of the legal boundaries of land and will usually indicate the dimensions and size of a lot. Three types of legal survey plans are available from the public register and copies can be purchased online from the Western Australian Land Information […]

  1. | 6 Jun 2013

    Storm Season – Simple Strategies

    Simple strategies for the arrival of the storm season The official ‘storm season’ runs from May to October in southern WA. There is no substitute for preparation, and there is plenty that can be done to protect your home in advance. This can save you a lot of time, hassle cost in the long run if […]

  1. | 6 Jun 2013

    Security: Your Home

    There are a number of factors to consider when you want to make sure your new or existing home is as secure as possible. Below are a list of things to consider when you are trying to make your home as safe as possible. Let’s look at the house   1. Are there security screens […]

  1. | 6 Jun 2013

    Solar Power System

    The Solar Panels collect the sunlight and create energy. They are attached to the roof by high strength rails able to withstand wind, rain and hail. The energy flows through to the Inverter which converts the current from Dc to AC (to usable household power).   A Bi-directional meter records the amount of power being […]

  1. | 6 Jun 2013

    Skylights – Location of Skylights

    The skylight should be located on the roof in such a manner that it is clear of overhanging trees and depending on aspect, is configured to meet lighting requirements of the room. They should also be located clear of obstructions including hips, valleys, air conditioning, vent pipes, solar water service etc. As skylights do not […]

  1. | 6 Jun 2013

    Noise

    Starting times must comply with local government by-laws which dictate the hours within which on-site work can take place. You should consult the building department of your local authority for the relevant requirements. Compliance with these by-laws is a condition on which the building licence is issued to the builder. Once you have discovered the […]