| 12 Mar 2014 PTC 2014 – Period Trade Contract Pack
Two copies of the Period Trade Contract 2014, plus User Guide. The Period Trade Contract is designed to assist contractors and subcontractors to better regulate their contractual relations where subcontractors are engaged on a periodic basis.
-
| 26 Jul 2013 AS2124 -1992 – General Conditions of Contract and Tendering; Form of Tender (AS 2125-1992); and Form of Formal Instrument of Agreement (AS 2127-1992)
General Conditions of Contract (AS 2124 – 1992). These editions of AS2124, AS2125 & AS2127 (bound together) were prepared by the Standards Australia Committee on General Conditions of Contract. While these are the latest editions, the 1986 editions remain as current Standards, the 1981 editions remain as available superseded Standards and the 1978 editions are […]
-
| 26 Jul 2013 DECON 2013 Design and Construct Contract
DECON 2013 is a Design and Construct contract which is used when the contractor provides all of the services necessary to complete a building project including provision of the design. The principal engages the contractor to undertake the responsibility for adopting a design that follows the principal’s project requirements and obtaining all licenses, permits, consents, […]
-
| 26 Jul 2013 CM 2012 Construction Management Contract User Guide
Construction Management Contract User Guide – assists in understanding the Construction Management Contract.
-
| 26 Jul 2013 ABIC MW.SC 2018 Contract Forms (PDF Format)
Comprehensive set of forms for use in administration of ABIC MW.SC-2018 Companion Subcontract to MW-2018.
-
| 26 Jul 2013 ABIC MW-2018 User Guide
The Australian Building Industry Contract (ABIC) suite of documents has now been marketed for seven years. The contract is regularly reviewed. This document sets out the changes made by the ABIC joint venture to the main contract during 2007 and 2008, marketed as the 2008 version of the Major Works Contract MW-2008.
-
| 26 Jul 2013 ABIC SW-2018 User Guide
A practice note for general guidance in understanding ABIC SW-2018 Simple Works Contract.
-
6 Jun 2013 |Timber Floorboards – maintenance
Timber flooring is a popular and attractive treatment however you have some work in front of you to achieve your desired result. Remove all existing floor coverings and assess the quality of the floorboards. If the boards have been sanded before, you need to know how much of the board is left and how much […]
-
6 Jun 2013 |Waste Management Contractors
Most of the contractors who specialise in recycling construction and demolition materials in Western Australia will negotiate removal logistics and prices for materials with you so that solutions are tailored to your project. Enquire about different costs for any separated waste. Ensure that at all times collectors implement litter management controls like covering their loads […]
-
6 Jun 2013 |Skylights – Sizing for adequate light
AS4285 – 2007 Size of Skylights The table below refers to skylight sizes commonly available throughout Australia. For practical purposes this table shows them as applied to typical rooms in Australian residential buildings where the skylights are not the only natural source of light. This table is based on many years of industry experience. Other […]