6 Jun 2013 |Extension of Time
Most building contracts allow the builder to claim an extension of time for completion of the project where there is a delay which could not reasonably be foreseen at the time of contract signing. Such delays could include strikes, unfavourable weather and unavailability of materials or labour. However, the exact terms of the building contract […]
-
6 Jun 2013 |Employer Record Keeping
-
6 Jun 2013 |Energy Rating
The Energy Rating Label was first introduced in 1986 in NSW and Victoria. It is now mandatory in all Australian states and territories for televisions, fridges and freezers, washers and dryers, dishwashers and air-conditioners to carry the label when they are offered for sale. The Energy Rating Labeling Scheme assists consumers with assessing the energy […]
-
6 Jun 2013 |Bricks
In the Perth metropolitan area, a large majority of all new homes are double brick structure. However in many regional areas of WA, framed construction is very popular. One of the main reasons why double brick is so popular is because of our sandy soil. The soil type is very stable with very little ground […]
-
6 Jun 2013 |Cleaning a Home
This is the simplest form of maintenance. Besides giving a bright appearance, cleaning can prevent build up of moulds and can stop moisture being trapped which can cause rust or rot, check such things as: Clean guttering as necessary to remove leaves, mud and other foreign matters; Remove rubbish accumulating close to walls; Check that […]
-
6 Jun 2013 |Concrete Slabs – Shrinkage
Curing is a process which takes place when a concrete slab is laid. As concrete is being poured, fresh concrete is converted into a solid mass when the cementeous materials hydrate. The action taken after the slab is laid to ensure hydration is called curing. Curing is the protection of fresh concrete from evaporation. When […]
-
6 Jun 2013 |Condensation
Condensation is at its maximum in new homes. When homes are built many gallons of water go into materials such as concrete, plaster, wallpaper, tile work and even some types of paint. This water evaporates; which explains the reason for a higher moisture content than usual in new homes. To aid the drying out process […]
-
6 Jun 2013 |Construction Starting Date
Defining the length of a construction period is not such a simple matter as it might appear. It is critical that you read your building contract carefully as the construction period probably does not commence from the date of contract signing. In order to determine the construction period, you need to make sure that you […]
-
6 Jun 2013 |Construction Software
In the construction industry, being a cutting edge company that embraces innovation and new technology can be the difference between being a true industry-leader and struggling to remain profitable. Different businesses require different systems. If your company reaches a point where you find your software systems and processes are holding you back from reaching your […]
-
6 Jun 2013 |Contracts for Home Building Work
The Home Building Contracts Act 1991 (the HBC Act) provides protection for home owners and persons undertaking home building work. Part 2 of the HBC Act applies to fixed price contracts for ‘home building work’ valued between $7,500 and $500,000. Home building work includes: constructing a new dwelling; carrying out additions to an existing […]