| 11 Jun 2013 Our Team
-
6 Jun 2013 |Termite Management Systems
In 2000, a new Standard was adopted for termite risk management. The Building Code of Australia (BCA) requires a barrier to be installed where the primary building elements may be subject to subterranean termite attack. A primary building element is a member of a building that takes part of the building loads and includes roof, […]
-
6 Jun 2013 |Tiles and Cracks
Lippage is a condition in floor tiling where one edge of a tile is on a different plane to an adjacent tile. In plain terms this means that one tile is higher than another giving the finished surface an uneven appearance. When large tiles are used on surfaces with compound falls to a floor waste, […]
-
6 Jun 2013 |Tiles and Lippage
Lippage is a condition in floor tiling where one edge of a tile is on a different plane to an adjacent tile. In plain terms this means that one tile is higher than another giving the finished surface an uneven appearance. When large tiles are used on surfaces with compound falls to a floor waste, […]
-
6 Jun 2013 |Tilt-Up Construction
Tilt-up construction is common in the commercial and industrial building sector and it is becoming more popular in the housing sector as a construction method. Tilt-up construction is a form of precast construction walls where panels are built on the ground on site, lifted and placed, then propped in position while the roofing structure is […]
-
6 Jun 2013 |Timber Rot
Timber rot was a major problem in some Perth homes. A survey a few years ago suggested that houses in Subiaco, Ardross, Floreat, Nedlands and Mosman Park were most likely to suffer from timber rot. This incidence of timber rot is not surprising as it usually occurs in older homes and caused by a lack […]
-
6 Jun 2013 |Thermal Mass
Thermal mass is often talked about as vital for good passive-solar design. Thermal mass in WA is easier to provide that you think, purely due to the materials we prefer to build with. The installation of concrete floors and brick walls provides the thermal mass of our buildings. We must make sure that it works […]
-
6 Jun 2013 |Timber Floorboards – maintenance
Timber flooring is a popular and attractive treatment however you have some work in front of you to achieve your desired result. Remove all existing floor coverings and assess the quality of the floorboards. If the boards have been sanded before, you need to know how much of the board is left and how much […]
-
6 Jun 2013 |Union Right of Entry
This Fact Sheet provides information about the right of entry requirements in the Fair Work Act 2009 (Cth) (FW Act). Right of entry permits The right of entry provisions in the FW Act allow union officials who hold valid entry permits to enter employers’ businesses for certain purposes. Union officials can apply to Fair Work […]
-
6 Jun 2013 |Unavailable Products
Sometimes building materials and products are specified by an owner, but become unavailable for reasons such as strikes, shipping delays, high demand etc. This presents the owner and the builder with a dilemma which must be worked through carefully. If these circumstances arise most building contracts provide that the builder must notify the client and […]