6 Jun 2013 |Electricity Connections and Headworks Charges
WA Electrical requirements provide for a standard supply up to: 63 Amps single phase (Perth and major towns) 32 Amps single phase (rural areas and small towns) 32 Amps per phase for multiphase (all areas) Consumer mains size of 35mm² (all areas) A large house with air-conditioning, pool and many appliances is likely to require […]
-
6 Jun 2013 |Extension of Time
Most building contracts allow the builder to claim an extension of time for completion of the project where there is a delay which could not reasonably be foreseen at the time of contract signing. Such delays could include strikes, unfavourable weather and unavailability of materials or labour. However, the exact terms of the building contract […]
-
6 Jun 2013 |Employer Record Keeping
-
6 Jun 2013 |Energy Rating
The Energy Rating Label was first introduced in 1986 in NSW and Victoria. It is now mandatory in all Australian states and territories for televisions, fridges and freezers, washers and dryers, dishwashers and air-conditioners to carry the label when they are offered for sale. The Energy Rating Labeling Scheme assists consumers with assessing the energy […]
-
6 Jun 2013 |Earthworks
Risk of Owner Earthworks Some home owners take on the task of organizing the earthworks and their certification themselves, rather than the builder charging for the responsibility. The aim of this is often to reduce building costs, removing these works from the contract with the builder. This in theory sounds fine, until you […]
-
6 Jun 2013 |Tips: First Home Buyer
First home buyer – tips Buying a first home can be a daunting experience. To make this process enjoyable, think about the following tips: 1. Read the contract carefully Make sure that you understand all the terms and conditions. If not, ask!! 2. Allow extra time for delays Despite the best intentions projects can run […]
-
6 Jun 2013 |Bricks
In the Perth metropolitan area, a large majority of all new homes are double brick structure. However in many regional areas of WA, framed construction is very popular. One of the main reasons why double brick is so popular is because of our sandy soil. The soil type is very stable with very little ground […]
-
6 Jun 2013 |Alternative Solutions in Building
When the Performance-Based Building Code was introduced in 1996, WA was the first State to adopt it. The new Code provided the flexibility that was lacking in the Uniform Building By-Laws that prescribed the minimum requirements for compliance of residential and non-residential buildings. The performance-based Building Code of Australia (BCA) maintains the prescriptive requirements as […]
-
6 Jun 2013 |Appliances and Building Specifications
It is common for home buyers to do insufficient research on whether a builder’s standard specification is suited to their needs. Frustrated new home owners sometimes discover too late that their new garage is not wide enough or high enough for their 4 wheel drive (especially for multi-vehicle households), or that their fridge is too […]
-
6 Jun 2013 |Apprentices: Hiring
Master Builders believes it is in the interests of builders and subcontractors to invest in our industry’s future by taking on and training apprentices. A Master Builders publication is available to as an easy guide to the requirements for employing an apprentice for either a part or the whole of their apprenticeship. Your Investment for […]